Throughout the planning with the Functioning platform and before the beginning on the drilling, an investigation really should be performed to assure the absence of any obstructions at the pile areas.Join a hopper to the best of tremie pipe. Following that, close the joint among hopper and tremie pipe by using a steel plug ahead of concrete initial